|
|
|
|
Although block 1 of the ouvrage du Pas du Roc was armed in June 40 it lacked a part of the earth cover. The harsh weather conditions in the Alps made the construction of the works very difficult, so some parts were still unfinished when the hostilities started in June 1940.
|